SÜTAŞ – ENFAŞ / Organic and Organomineral Liquid Fertilizer Production Plant (Biogas Integrated)

Capacity
3 tons/hour (Filling Line)
Project Type
Organic and Organomineral Liquid Fertilizer Production Plant
Organic Raw Material Source
Liquid organic output from biogas plant
Country
Tire – İzmir / Turkey

Project Description

Within the scope of this project, an integrated liquid fertilizer production plant with a capacity of 3 tons/hourwas designed, manufactured, and commissioned byHILTAR Engineeringfor Sütaş, fullyintegrated with the existing biogas facility.
The plant converts liquid organic output from the biogas process into high value-added liquid fertilizer products through a continuous and controlled production process.

Scope of Work

  • Process and mechanical design
  • Engineering and manufacturing of fermentation, sterilization, and reaction processes
  • Design and manufacturing of reactors, homogenizers, and maturation tanks
  • Installation of filling and packaging lines
  • Integration with existing biogas facility
  • Commissioning and process optimization

Technical Features

  • Process infrastructure suitable for organic and organomineral liquid fertilizers
  • Fermentation and sterilization units optimized for biogas-derived liquid raw materials
  • High-efficiency reactors and homogenization system
  • Product stability ensured through maturation tanks
  • Flexible filling and packaging infrastructure
  • Industrial-scale continuous operation design

Results & Performance

  • Conversion of biogas liquid output into value-added products
  • Stable and reliable filling performance at nominal capacity
  • Homogeneous product quality and high standards
  • Sustainable and economical operation through integrated plant design